April 08, 2014 at 10:56 | Analysis of Ecological Risks | Tavush
Thus, SHPPs will pipe a total length of 7000 meters of river territory, which makes up around 22․5806% of the river. Under EcoLur’s Ecological Risk Model, this indicator shows that..
March 10, 2014 at 15:17 | Analysis of Ecological Risks | Vayots dzor
The SHPP pipes a total river area of 4411.2 meters, which makes up 20.% of the river.Under EcoLur’s Ecological Risk Model, this indicator has caused ...
March 05, 2014 at 14:46 | Analysis of Ecological Risks | Lori
The Martz River flows in Lori Region, is the right tributary to the Debed River. It starts from the south-eastern slopes of Gugarats mountain range. Its length is ...
February 17, 2014 at 13:18 | Analysis of Ecological Risks | Vayots dzor
Hermon SHPP is constructed on the Aysas River operated by “Elegis HPP” LLC, the derivation length is 3270 meters. It should be mentioned that “AratesEnergy” LLC is planning to construct...
February 14, 2014 at 14:03 | Analysis of Ecological Risks | Lori
The first material is beating an alarm signal about the disastrous state of the Kistum River. The Kistum River is located in...
November 18, 2013 at 16:46 | Analysis of Ecological Risks | Yerevan
The construction of the highway joining Tsovakal Isakov Avenue and Arshakunyats Avenue will make Yerevan air more polluted. As the project EIA says, during the construction the following emissions
October 29, 2013 at 12:30 | Analysis of Ecological Risks | Yerevan
According to this show, the hazardous emissions for 2012 in Arabkir made up 11863,1547 tons. Erebouni administrative area holds the...
August 13, 2013 at 16:29 | Analysis of Ecological Risks
EcoLur’s Expert Group has developed an interactive model of ecological risk analysis for selected areas. The model is based on the principles of ISO 14031 – 2005 environmental performance evaluation, Armenian laws and bylaws approved by the resolutions