Water Intake Volume of "Chanahkchi-2" SHPP To Be Decreased

Water Intake Volume of

EcoLur

It is envisaged to reduce the water intake of " Chanahkchi-2" SHPP from 2500 l/s to 980 l/s. The SHPP is operated by Mavr LLC.

The discussion of the preliminary version of SHPP new water permit project will be held on January 14, 2020, at 4:00 pm in the 3rd Government House (5th floor, 541 room).

January 13, 2020 at 14:43