

EcoLur
“Daranak” SHO will leave from Dara River, which is equal to the half a bucket per second. The SHP consists of two knots located on the Dara River and its left-bank tributary. The environmental flow of the other knot is a little bit higher – one bucket of water per second. Which river ecosystem will be able to be preserved is not even a question, it won’t survive. It should be noted that the Dara River is part of the river basin of Lake Sevan and should be protected under RA Law ‘On Lake Sevan’ with all ensuing consequences. Nevertheless, the project goes at its pace and the specialized public hearings on the project of “Daranak” SHP submitted by “Agrospasarkum” of Vardenis Territorial Union of Agro Union in Yerevan at 12:00 on 19 February at 51 Gay Avenue. The project developer is “Hayhydroenergi Nakhagits” CJSC. EcoLur working group will take part in these hearings and will ensure live broadcasting.
February 18, 2013 at 14:48
