ArmInfo
GeoProMining Gold company has acquired from an American company OGSE a ready Oxygen plant, which is designed for oxidation of refractory ores, which are not subjected to natural oxidation.
Oxygen plant consists of compressors and special containers filled with nitrogen absorbents. The process is as follows: the nitrogen, passing through the container, stays on the absorbents, and oxygen comes out and is fed to the processing of ore.
As press service of GeoProMining Group in Armenia told ArmInfo, installment of the integrated equipment at the plant provides for saving of reagents and the possible increase in the percentage of gold extraction. The equipment is installed by OGSE operators, producer of the complex.
Company GPM Gold, included in the group of companies GeoProMining specializes in the mining industry, operates Sotk gold deposit and the Ararat Gold Recovery Plant.
August 13, 2010
