November 16, 2021 at 13:44 | Small HPPs, Energy | Lori
The residents of Kurtan settlement in Gyulagarak enlarged community in Lori Region have started collecting signatures against the project of building a new SHPP on Dzoraget
November 11, 2021 at 14:45 | Small HPPs, Energy
The Armenian government intends to increase the share of solar energy production to 15% by 2030, and reduce the share of hydropower by 2.6%
November 10, 2021 at 17:01 | Small HPPs, Energy | Lori
Some of the participants in the public hearing put pressure on the members of civil society
November 03, 2021 at 12:17 | Small HPPs, Energy | Yerevan
The students of the American University of Armenia (AUA) offer three solutions to meet the climate challenge, reduce air pollution, and lighten the city's traffic flows
November 03, 2021 at 10:24 | Small HPPs, Energy | Lori
On November 8, public hearings will be held on the project of construction of "Loriberd" SHPP in the village of Kurtan, Gyulagarak enlarged community, Lori Region
November 01, 2021 at 13:21 | Small HPPs, Energy | Aragatsotn
During the hearings, Inga Zarafyan, President of "EcoLur" Informational NGO, raised the issues of further storage management and recycling after the expiration of the panels
October 29, 2021 at 13:38 | Small HPPs, Energy | Aragatsotn
RA Government decided to invest 377.4 hectares of land worth 822,084,793 AMD in the statutory capital of State Interests Fund of Armenia within the framework of “Ayg-1"
October 28, 2021 at 13:51 | Small HPPs, Energy | Tavush
The employees of Nature Protection and Mining Inspection Body found violations in "Aghstev-1" SHPP operated by "LNX" LLC
October 28, 2021 at 13:04 | Small HPPs, Energy | Lori
Dormer Yerevan Deputy Mayor, Former Director of "Northern Avenue and Cascade" PIU Karen Davtyan and the companies operating hydroelectric power plants belonging to his family went bankrupt by a court decision and are now in the process of bankruptcy
October 19, 2021 at 17:05 | Small HPPs, Energy | Lori
On October 21, 2021, the first round of public hearings on the application for the preliminary environmental impact assessment of the construction of a hydropower plant in Agarak, Lori Berd, Koghes and Yaghdan settlements will take place in Lori Berd Municipality
October 18, 2021 at 10:17 | Small HPPs, Energy | Syunik
The water intake from the reservoirs for energy purposes is about 63 times higher than the water intake for irrigation
October 15, 2021 at 09:55 | Small HPPs, Energy | Yerevan
In the next 1-1.5 years, a floating photovoltaic station with an installed capacity of 156 kW will be built on Lake Yerevan
October 12, 2021 at 09:00 | Small HPPs, Energy | Yerevan
Solar photovoltaic stations have been installed in 40 of 43 blocks of flats involved in the first stage of the “EU4Yerevan: Solar Community”
October 09, 2021 at 16:46 | Small HPPs, Energy
"Green" Skills for Youth
October 05, 2021 at 15:30 | Small HPPs, Energy | Shirak
The negative conclusion was based on the crisis situation in the Akhuryan River, which is due to the over-exploitation of the river
October 04, 2021 at 12:22 | Small HPPs, Energy | Gegharkunik
Recently, the pipe of Argichi SHPP, built on the Argitchi River in Gegharkunik Region, exploded once again, creating a hole 3 meters deep
October 01, 2021 at 14:19 | Small HPPs, Energy | Vayots dzor
It is planned to build five new solar stations in the territory of Herher and Azatek settlements in Jermuk Community in Vayots Dzor Region, Armenia
September 24, 2021 at 17:39 | Small HPPs, Energy | Syunik
Information on Spandaryan, Shamb, Tatev, Tolors and Angeghakot reservoirs built for the operation of the Vorotan hydropower complex is not available to the general public